The below table shows what T2 items have been put up on the market today.
This concludes the goals of April.
T1 | T2 | T3 | T4 | |
Electronic warfare | ||||
Interference module | 30 | |||
Nexus Modules | ||||
Velocity NEXUS module | 30 | |||
Assault NEXUS module | 30 | |||
EW NEXUS module | 30 | |||
Armor NEXUS module | 30 | |||
Industrial NEXUS module | 30 | |||
Farlock NEXUS module | 30 | |||
Lock booster NEXUS module | 30 | |||
Evasive NEXUS modules | 30 | |||
Repairer NEXUS module | 30 | |||
Critical hit NEXUS module | 30 | |||
Recharger NEXUS module | 30 | |||
Fast extractor NEXUS module | 30 |
We are only 2 weeks into April and our goals have already been completed.
This is actually just as we have planed, the reason for why we wanted to be done with the goals this soon is that we need a lot of time to prepare for the T3 and T4 production next month.
Lets take an example of what we are facing:
One of the items we want to produce the T3 and T4 version of next month is the EW NEXUS.
We want to make a sell order of 30 T3s and 30 T4s, when we make a sell order we do not only produce the 30 that we put on the market we also produce 30 extra so we are ready to replace the sell order as fast as possible if it gets sold.
So this means that we need to produce 60 T4 EW NEXUS, but since all higher tier item always need a lower tier item in the production, we also need to build 60 T3s, 60 T2s and 60 T1s, the same rule applies to the T3 order, so totally we need to build 60 T4s, 120 T3s, 120 T2s and 120 T1s just to make the 2 sell orders of 30 T3s and 30 T4s.
Every single NEXUS takes about 2.5 hours to make in the factory and with a total of 420 items to build that makes a total of 1050 hours building time or 43.75 days, and that is just for the EW NEXUS orders, and with 7 different items with 43.75 days building time and 9 other items that we only have the T3 research for but also wish to build, next month is going to put a large strain on our factories.
And that is why we wanted to finish this month goals early so we can start to build the needed T1s and T2s already this month, otherwise we simply do not think we would be able to finish next month goals.